Boilers equipped with Low NOx Burners
Full load achieved in less than five minutes

|
| Calpine
Corporation |
RENTECH was selected to provide three 250,000 pound
per hour auxiliary boilers for Calpine's Channel
Energy Center in one of the world's largest industrial
corridors.
Calpine's requirements:
|
|
Boilers to operate at 600 PSIG, 750° F
Backup the primary gas turbine / HRSG boilers
If the primary equipment should fail, the
boilers
must reach full capacity in five minutes or
less
These are the first superheated boilers
in the
world to meet this startup criteria
Boilers must comply with the most stringent
Texas TNRCC air quality standards |
|
|
|
|